FACULTY OF PETROLEUM

The Faculty of Petroleum was established according to the Decision No 1786/QĐ-ĐTNL on the 24th December 2007 issued by the Rector of PVMTC. It then consisted of 2 specific disciplines : Drilling & Production and  Oil refining & petrochemical.

Functions and core tasks:
-    Training  vocational courses of intermediate and college levels in the fields of  petroleum drilling, production, oil refining, gas processing and petro-chemical.)

-     Pre-employment training for Petrovietnam’s projects: technology transfer training, specialized training hands-on & on-the-job training.
-   Training participants to improve the professional levels of oil and gas industry.

Training facility system:
-    Full size Drillsim 5000 simulator (Drilling System)
-    Full size  oil & gas production simulator (Kongsberg)
-    Dynamic oil & gas processing and petrochemical simulator (ABB)
-    Refining and gas processing simulator (SimInfosystems)
-    Petrochemical Laboratory (VILAS 542)
-    Mud drilling Laboratory
-    Oil and gas processing equipment for operation workshop

Typical activities:
Over a period of 8 years from 2007 till now, the Faculty has succeeded in training human resources of operation and maintenance for scores of projects:
-    Dung Quat Refinery (2007-2008) including 435 engineers and 358 technicians. The training program was conducted under the supervision of Training management Contractor - Petroconsults.
-    Dung Quat Polypropylene Plant (2008) including 100 engineers and technicians.
-    Ca mau Fertilizer Plant (2009-2011) including 197 engineers and 263 technicians.
-    Dinh Vu Polyester plant - PVTex (2009-2011) including 60 engineers and 380 technicians, the Faculty sub-contracted to the main contractor HEC to conduct mentoring training for 60 engineers on Intensive Elementary Technical section, a part of on-the-job training program.
-    Dung Quat Bio-Ethanol plant (2010-2011) including 41 engineers and  96 technicians.
-    Phu Thọ Bio-Ethanol plant (2011) including 33 engineers.
-    Thi Vai refrigerated LPG storage project - PVGas (2012) including 16 engineers and  14 technicians.
-    Additionally training human resources of operating for Dung Quat refinery  (2014-2015): including 87 engineers and  71 technicians.
-    Nghi Sơn Refinery and Petrochemical complex (2014-2016): including 319 engineers and 313 technicians. The training program was conducted under the supervision Training management Contractor - Honeywell.

Achievements:
-   Petrovietnam’s certificate of merit (2013, 2015)
-   Ministry of Industry and Trade’s certificates of merit (2015)

Managers
Manager                :  Mr Nguyễn Huỳnh Đông (0917.407077 / This email address is being protected from spambots. You need JavaScript enabled to view it.)
Deputy manager  :  Mr Trần Thanh Huy (0913.310662 / This email address is being protected from spambots. You need JavaScript enabled to view it.)
Deputy manager  :  Mr Lê Quốc Hoàng (0919.539977 / This email address is being protected from spambots. You need JavaScript enabled to view it.)